Installing Catnic steel lintels requires precise alignment, specified end bearings, and rigorous adherence to damp-proof course (DPC) integration to maintain structural integrity and moisture control. Proper execution involves ensuring a minimum 150mm end bearing on each side, consistent leveling using mortar bedding, and strictly avoiding point loading during the curing phase of the masonry work.


Pre-Operation Requirements and Tooling Strategy

Achieving a durable structural opening demands a systematic approach to preparation. Catnic lintels are designed to act as a composite beam; they rely on the surrounding brickwork and the mortar bond to achieve their rated load-bearing capacity. Before beginning, ensure the masonry jambs are plumb and that the structural opening width matches the lintel length requirements.



  • Essential Equipment: High-grade spirit level (minimum 1200mm), heavy-duty rubber mallet, mortar board, pointing trowel, DPC material, and adequate scaffolding or mechanical lifting aids for larger spans.
  • Safety Gear: Steel-toed boots, protective gloves, and safety glasses to prevent injury from falling masonry or metal edges.
  • Project Benchmarks: Plan for a minimum 150mm bearing at each end for openings up to 3000mm. For spans exceeding 3000mm, consult specific structural engineering calculations or the Catnic load span tables, as these may require extended bearings of 200mm or more.
  • Execution Timeline: For a standard window or door opening, budget approximately two hours for proper placement, leveling, and initial bedding per unit, excluding drying time.

Step-by-Step Installation Procedure



Step 1: Substrate Preparation and Leveling

Before placing the lintel, the supporting masonry (jambs) must be checked for level. Any deviations here will manifest as structural weakness in the beam. Apply a solid, even bed of mortar, typically 10mm to 15mm thick, across the bearing area of the masonry jambs. Ensure the mortar is of a consistent grade as specified by the project structural engineer.



Step 2: Lintel Placement and Positioning

Lower the Catnic lintel onto the fresh mortar bed, ensuring it is centered over the opening. Use your spirit level to verify that the lintel is level in both the horizontal and longitudinal planes.

Warning: Never use small pieces of brick or plastic shims to level a lintel if they create point loads. The lintel must be supported along the full length of the required bearing area to avoid stress concentrations that can lead to steel deformation or mortar failure.



Step 3: Installing the Damp Proof Course (DPC)

The DPC is critical to preventing moisture ingress into the building envelope. Apply the DPC tray along the length of the lintel, ensuring it extends at least 150mm beyond the opening on both sides. The DPC must be positioned to project slightly beyond the outer face of the outer leaf brickwork to ensure water is shed away from the cavity.



Step 4: Masonry Loading

Begin laying the first course of masonry on the lintel only after the bed mortar has achieved sufficient initial set. Ensure that the mortar joint between the lintel and the brickwork is fully filled. It is imperative to lay the masonry courses evenly across the span to prevent uneven loading during the curing process.



Step 5: Tying and Cavity Maintenance

Ensure all brick ties are installed according to local building regulations, typically positioned within 225mm of the lintel and spaced at 450mm centers horizontally. If the lintel design includes a built-in weep hole or drainage slot, verify that it remains unobstructed by mortar droppings or excess DPC material.


CCB Arch Lintels for Brick | Lintels | Catnic

CCB Arch Lintels for Brick | Lintels | Catnic

Technical Specifications and Performance Parameters

The following table outlines the standard requirements for selecting and installing lintels based on span and configuration.



Parameter Standard Requirement Deviation Impact
Minimum Bearing 150mm per side Risk of masonry crushing/collapse
Bed Mortar Thickness 10mm - 15mm Uneven load distribution
DPC Projection 150mm beyond opening Moisture ingress and efflorescence
Masonry Tie Spacing 450mm Horizontal Reduced composite strength
Vertical Tolerance +/- 3mm over 1m Structural instability

Field Troubleshooting and Failure Remedies



  • Issue: Lintel is sagging under initial masonry load. Root Cause: Insufficient mortar cure time or lack of propping during the laying of the first three courses of bricks. Actionable Fix: Install temporary props at the center of the span until the mortar has reached 70% compressive strength.
  • Issue: Visible moisture patches on internal walls near the lintel. Root Cause: DPC not correctly integrated or obstructed weep holes preventing cavity ventilation. Actionable Fix: Inspect the DPC for punctures or bridging; clear any mortar droppings from the lintel channel and ensure weep holes are clear.
  • Issue: Mortar bed has cracked beneath the lintel. Root Cause: Uneven masonry jamb height causing the lintel to "rock" or sit on a single point. Actionable Fix: Carefully lift the lintel, remove the failed mortar bed, and re-level the jambs using a consistent, high-strength mortar mix.

Frequently Asked Questions



Do Catnic lintels require propping during installation?

For most standard domestic spans, propping is not required if the mortar bed is correctly applied and allowed to set; however, for spans exceeding 2400mm or when applying heavy stone cladding, temporary mid-span propping is highly recommended until the masonry has cured.



Can I shorten a Catnic lintel if it is too long for the opening?

No. Modifying the length of a steel lintel compromises its structural load-bearing capacity and removes the anti-corrosion galvanization coating, leading to premature structural failure.



How should the cavity be handled with a cavity wall lintel?

The inner and outer leaves must be built up simultaneously to keep the lintel balanced, and the cavity must be kept free of mortar droppings to prevent cold bridging and moisture transfer.



Is the DPC included with the lintel?

No, the DPC is a separate requirement that must be sourced to the project's specific width and length requirements based on the lintel profile and the thickness of the cavity.

Ensure your masonry project meets the highest standards of structural safety by sourcing high-quality lintels and following precision installation protocols. Contact our technical team today to discuss your specific load-bearing requirements and ensure project compliance.


Buy Catnic L Shaped Angle Steel Lintels | Next Day Delivery Available

Buy Catnic L Shaped Angle Steel Lintels | Next Day Delivery Available

Read also: Lorain Mugshots: A Comprehensive Guide to Accessing Public Arrest Records and Jail Rosters in Lorain County